Bangkok Trip
7–11 October, 2026
CX717 Wed 7 Oct, HKG 09:00 → BKK 11:05
CX654 Sun 11 Oct, BKK 15:00 → HKG 19:05, one of us
CX706 Sun 11 Oct, BKK 16:25 → HKG 20:30, the other two
Grande Centre Point Terminal 21 Asok
1Plan — booked or decided by the group
2Suggestion — from the Wishlist, nothing booked
HHotel
★Yellow — mentioned before
Getting in and out
Airport Rail Link and one MRT stop, about an hour with bags.Arrival, Wednesday
1
Suvarnabhumi → ARL to Makkasan
Immigration and bags take about an hour. The City Line leaves from the basement, 35 THB, around 25 minutes.
2
Makkasan → MRT Phetchaburi → Sukhumvit
Covered walkway to the MRT, one stop, then exit straight into Terminal 21. Check-in is 14:00; drop bags if the room isn’t ready.
InsteadGrab is about 400 THB and 45–70 minutes with the airport-road works. The ARL → Phaya Thai → BTS route also works but means the Siam interchange with suitcases.
Departure, Sunday
3
Reverse it: MRT → Makkasan → ARL → airport
About 40 minutes. Two waves: the CX654 traveller leaves at check-out, around 12:00, to be at the airport by 12:45 for the 15:00 flight. The other two leave by 12:45 to be there by 14:00 for CX706 at 16:25. Sunday afternoons are busy and you’ll have shopping.
行街街
The malls and markets worth a detour, pinned around the hotel. 🏬 indoor and air-conditioned, 🌤️ open-air, 🏬🌤️ both.Nearest first from Asok, then the Siam cluster, then the long trips